- Best Practices for Equipment O&M
-
O&M Best Practice Issue Discussions
- Advanced Maintenance Approach: Reliability Centered Maintenance
- Applying Key Performance Indicators
- Comprehensive O&M Program
- Contract Challenges and Improvements
- Cybersecurity for O&M Systems
- Existing Building Commissioning Procurement
- Healthy Building O&M
- Integrating and Analyzing Building Information to Support O&M
- Maintenance Approaches
- OMETA: An Integrated Approach to Operations, Maintenance, Engineering, Training, and Administration
- Prioritizing O&M Actions
- Re-tuning Buildings
- O&M Contracting
- Tools
- Glossary
O&M Contract Guidance and Best Practices
Introduction/Objective
Operations and maintenance (O&M) contracting continues to be a mainstay for facility management in the federal government and private sector alike. In many cases, contracted (or outsourced) O&M frees facility managers to focus on core, mission-related requirements while handing off routine or highly specialized activities to experienced contractors. This hand-off often comes in the form of multiyear O&M contracts aimed at keeping facilities operating in a safe, healthy, and efficient manner.
As buildings and building systems become more complex, there is a defined need for advanced experience/expertise beyond the core capabilities of typical O&M program staff. Factors contributing to the trend toward contracted O&M services include:
- The prevalence of “smart” and/or “connected” buildings, where systems can be monitored, controlled, and diagnosed remotely through contract service providers, continues to grow.
- Facility budgets have long been the subject of cost-cutting; O&M budgets have experienced these reductions with a potential for further workforce reductions.
- The 2020 COVID-19 pandemic and the 2025 Deferred Resignation Program for U.S. federal employees have accelerated the retirement trend, and with this comes a potential loss of corporate knowledge, resulting in—at least in the near-term—a less-skilled workforce to fill these roles.
- Vendor-specific O&M requirements to maintain equipment warranties can drive the necessity for more contracted O&M services.
- Through government requirements, regulations, or mandates, contracted services are affording efficiencies to federal agencies attempting to remain compliant with an ever‑increasing list of requirements.
As outsourced contracting continues its prevalence, a more standardized and straightforward approach to O&M contracts would offer greater efficiency and consistency in contract development, implementation, and transition.
Discussion
The O&M Contracts Templates web page offers equipment-specific templates for both prescriptive and performance-based approaches to O&M contracting. Each customizable template provides contract language to be inserted into the technical service contract or statement of work (SOW) sections of the larger O&M contract. The Introduction to O&M Contract Tool web page describes different approaches to contracting (prescriptive and performance-based) so agencies can select suitable templates for implementation.
This discussion provides further detail and context for federal O&M contracting, covering the following areas:
- Typical O&M Contract Structures
- Functional O&M Plans
- Spare Parts Management
- Contract Transitions
Typical O&M Contract Structures
An overall O&M contract can come in several different forms and formats. While different in appearance, many O&M contracts contain similar sections, content, requirements, and references. The contract shall be numbered through the document (consecutively) to ensure ease of reference. The deliverables and requirements may have unique IDs as required by the contracting officer representative (COR) or government designee to facilitate contractor accountability.
A standard O&M contract will have sections addressing the following four aspects, which may be included to the customizable template if they add value and clarity.
I. General Requirements and Schedule
This section typically contains the logistics of the contract (the issuing office, addresses, contract number, etc.); all descriptions of the supplies, services, and SOW; details for inspection, acceptance, quality assurance, and reliability requirements; and time, place, and method of delivery or performance.
In addition, this section may contain a communication matrix that defines the method and frequency of communication. It may also identify organizational roles and responsibilities (e.g., responsible, accountable, consulted and informed [RACI] matrix), approval authorities, and emergency procedures.
II. Contracts Clauses
This section usually includes standard clauses of considerable power that define the rights and responsibilities of contracting parties. It also contains clauses mandated by regulations or laws. Local clauses are also added depending on the particular location.
III. List of Documents, Exhibits, and Other Attachments
This section provides a list of required documents, exhibits, and other items, and may include cross-references to material in other sections of the contract. It should provide a list of all pertinent government-furnished property, equipment, meters, and systems. It should also provide drawings, floor plans, and manufacturer’s equipment guidelines. For example, equipment specifications (especially for unique critical equipment and/or HVAC systems) and/or manufacturer’s recommended operating parameters shall be provided in the solicitation.
The solicitation shall include any related procurement requirements such as the Buy American Act[1]. It shall include site-specific standards or procurement preferences such as requiring any controls-related equipment/devices, such as lighting and HVAC systems, be "open protocol" and be "BACnet compliant" to facilitate the integration of these devices into the building automation system (BAS). In addition, it shall include FAR 23 mandates that all federal agencies purchase Energy Star-certified or Federal Energy Management Program (FEMP)-designated products to improve energy efficiency.
The solicitation should also include any pertinent standards from organizations such as the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) which have many standards that have been adopted by a local, state, and/or federal agencies and are legal requirements. These standards are constantly being updated to keep up with the dynamic equipment industry, but many—like ASHRAE—are available to view on the organizations' websites[2].
IV. Representations and Instructions
This section includes contract solicitation provisions that require representations, certifications, or the submission of other information by bidding contractors. This section also includes solicitation provisions and other information, or instructions not provided elsewhere, to guide bidding contractors in preparing a request for proposal (RFP) or respond to a request for information (RFI). This section may also instruct prospective bidding Contractors to submit proposals or information in a specific format or severable parts to facilitate evaluation.
Statements of Work/Performance Work Statements
Relevant to the O&M Contracts Templates available for download and a critical element of the overall O&M contract is the “Statement of Work” or the “Performance Work Statement” (usually found in Section C of Part I of the overall contract). In a very specific way, Section C delineates the scope of the O&M services and administrative aspects of the contract, and this is the primary section that the customizable template was developed to interface with. A detailed discussion on this section is found in Introduction to O&M Contract Tool.
After characterizing the needs, the agency may choose prescriptive or performance approaches or a combination of approaches. A hybrid approach combines prescriptive and performance mechanisms into the overall contract. The templates provided on the O&M Downloadable Contract Templates web page allow for this option—whereby users can be very specific (and prescriptive) with certain systems (e.g., high-reliability and/or sensitive equipment)—as well as a performance-based approach for systems not needing such specificity and prescription.
Operations and Maintenance Plan
In addition to contract requirements, agencies can require the bidding contractors to provide a written site-specific O&M Plan and include it in their solicitation response to the RFP. The plan shall be tailored to the site by using the information provided by the agency. If any information is missing to develop a thorough and comprehensive plan, the contractor shall request it from the agency. A functional and effective O&M plan can reduce energy costs while ensuring safety, tenant comfort, and the life expectancy of the equipment. The O&M plan shall stipulate a maintenance approach (e.g., reactive, preventative, or predictive) or reliability-centered approach, which is a strategic combination of these to achieve a cost-effective, optimal approach.
The plan can provide:
Customization by choosing a combination of maintenance approaches that is tailored to the site-specific equipment and existing systems such as a computerized maintenance management system (CMMS) and/or a BAS.
Standardization of tasks and activities,
Documentation and Reporting to track tasks and ensure accountability,
Risk Mitigation by outlining methods to comply with federal and state regulations and unintentional equipment failure.
Improved efficiency and reduced facility energy use by 5–20 percent[3].
The O&M items (e.g., deliverables) below shall be included in the contractor’s bid, and many of these, such as inventory control (e.g., parts management), will be included in the bidding contractor’s comprehensive O&M Plan, unless addressed elsewhere in the contract bid package:
IMPORTANT: The following sections contain highlighted words {in brackets} that federal agencies are expected to add, remove, edit, and/or change in the template language to fit their needs and requirements.
Organization of the company including the expertise of the company’s personnel.
Roles and responsibilities within the company; scheduled and unscheduled tasks.
Communication and reporting: Specify the frequency of touch points and personnel involved as well as the types and frequency of reports you will provide to the client, summarizing your performance and the status of assets.
Response times: Provide guaranteed response and resolution times for different types of work, such as emergency repairs versus routine maintenance.
Use of technology: Describe any software or systems you use for managing work orders, asset tracking, or communicating with the client.
- QA/QC plan and documentation requirements; this shall include but not be limited to:
- Inspections: The contractor shall provide in the plan the frequency of inspections, the types (e.g., predictive, preventive) of inspections to be performed, the equipment/system being inspected, and the reason for inspection (e.g., mandated by regulations, investigating alarm or sensor indications, routine/optimize performance) with all associated costs. The contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The scope and all associated costs per inspection shall be provided. The contractor shall maintain complete inspection records and make them available to the government.
- Testing: The contractor shall provide in the plan the type of test (e.g., infrared scanning, ultrasonic, eddy current testing), whether the test will be performed by the contractor or outsourced to a subcontractor (e.g., eddy current testing requires non-destructive testing certification; thus, if the contractor does not have staff with the qualifications, it must be outsourced), and the frequency of testing. The scope and all associated costs per test shall be provided. The contractor shall maintain complete inspection records and make them available to the government.
- Safety and risk plan:
- Potential risks and hazards associated with the work shall be identified along with brief strategies to mitigate them.
- Health and safety plan: Outline the specific safety protocols, training, and emergency procedures that your team will follow.
- Insurance and bonding: Provide details on your liability insurance and other relevant coverage to protect the client from financial risk.
- Performance metrics: Outline the key performance indicators you will track to measure efficiency, such as work orders generated/closed, equipment uptime, energy usage, and safety records.
- Customer satisfaction: Explain your process for gathering and acting on client feedback to ensure their needs are met.
- Continuous improvement: Detail your process for evaluating performance and implementing improvements over the life of the contract.
- Inventory control: The contractor shall be responsible for providing a list of recommended spare parts and small tools required for the work and defining those that the contractor has included in the bid and those not included in the bid. The parts list shall include a detailed list of consumables (aka “first fills”) and associated costs. The contractor shall be responsible to replenish the first fills throughout and at the end of the contract with quality spare parts that are approved by the COR. First fills shall include but not be limited to lubricants, coolants and hydraulic fluid, process chemicals, refrigerants, and others. The award-winning contractor shall perform an inventory of first fills within the first {2 weeks} after award and update the list with detailed costs as necessary for COR or government designee approval. The COR shall provide a list of government-furnished properties. The contractor must maintain a property management system for any government-furnished property to control, use, preserve, protect, and repair it.
- Asset management: Explain your approach to managing asset information, including how you will use or create O&M manuals and update other documentation.
- Qualifications: Contractors shall provide a summary of:
- Contractor experience on similar projects; provide testimonials and at least three references from past projects.
- Experience and qualifications of the personnel proposed to work on the project.
- Valid and current credentials and/or licenses indicating that the company and/or individuals in the company are competent and knowledgeable on O&M of mechanical systems, plumbing, HVAC, and boilers, and they adhere to professional and safety standards.
- Documentation: The Contractor shall be responsible for tracking and recording all O&M documentation as agreed to per the contract, and during the contract term. This shall include but not be limited to:
- Provide the government with detailed written service reports after each visit. The report must be emailed to the COR no later than {3} business days after the work has been completed. The costs per test shall be provided in the solicitation. These reports shall contain, at a minimum, the list of personnel who were on site, and for each individual, the times of arrival and departure, the total number of hours worked, and the tasks performed.
- Provide separate reports for equipment inspections and/or log the report into the work control system (including date, time, and the name[s] of the technician[s]), according to the agency’s procedures. All written reports need to be in black ink and legible. The reports shall contain, at a minimum, equipment identification numbers where applicable, anomalies in existing conditions, all as-found and as-calibrated/adjusted values for all calibration points, any mechanical adjustments, all repairs performed, and any problems requiring further action and recommendations to correct the same.
- Setpoint/process changes to the system(s), which at minimum shall include:
- Parties involved: Identifies the owner and contractor personnel involved in the change.
- Description of change: A clear and detailed explanation of what is changing, often referencing specific drawings or specifications.
- Reason for change: Explains why the change is necessary.
- Cost and schedule impact: A breakdown of the new costs and any adjustments to the project timeline.
- Signatures: The formal agreement of all parties, including the COR or government designee and the contractor.
- Updated as-built drawings
- Inspections, commissioning and testing reports
- Warranties
- Manufacturer's literature
- Health and safety information
- Permits
- Transition plan: Describe how you will seamlessly transition work from the previous contractor or construction team to your O&M team.
- Cost Estimate: Provide a comprehensive estimate that separates costs for labor, materials, equipment, and any subcontractors. The estimate shall include a payment schedule, milestones and deliverables that complement the schedule, a list of permits needed, and contingency information with a level of detail indicating the estimate's accuracy.
- Schedule: Provide a detailed breakdown of the scope of work. The schedule shall include any safety protocols, permits needed, quality control measures/hold points, inspections/testing, shutdowns and start-up periods, milestones, deliverables, contingency information including any unforeseen or potential risks anticipated, project management strategy, and exclusions highlighting what is not included in the bid.
These deliverables shall be included in the contractor’s bid and if requested, the contractor’s comprehensive O&M Plan shall also be included in their bid.
If the O&M plan is included in the bid, it will be reviewed by the COR, other subject matter experts (SMEs), and/or other government designees and shall be used as a method to evaluate bidding contractors as it provides a roadmap indicating how the contractor will operate and maintain the facilities. It also allows the contractors bidding on the work to show their expertise and experience as well as gives the agency insight on how each contractor plans to provide services.
When a contract is awarded, the Government-approved O&M Plan shall be integrated into the contract as a component of the final agreement.
Spare Parts Management
Spare parts are the critical components that are kept in inventory to address preventive maintenance activities, equipment repairs, and system failures. In the contracted O&M setting, effective spare parts management is critical for efficient operations, resilience, minimized downtime, reduction of costs, and reliable system operation.
I. Spare Parts Management Program Benefits
Effective spare parts management requires that proper parts be available when needed while minimizing downtime and associated costs. Benefits of an effective spare parts management program include the following.
Inventory Management, Accuracy, and Visibility: Coupled with a modern CMMS, an effective spare parts management program offers a centralized platform for instantaneous tracking and reporting on parts usage and inventory levels. This comprehensive view provides management with accurate and real-time information, minimizing the risk of shortages or overstocking.
Enhanced Maintenance Planning: Effective spare parts management facilitates the shift from reactive to proactive maintenance by anticipating future spare parts requirements for break-down and preventive maintenance tasks. By using existing data and predictive routines, maintenance managers can estimate the spare parts needed for upcoming maintenance activities, optimizing planning and reducing the likelihood of unplanned downtime.
Streamlined Procurement Processes: An effective spare parts management program can automate the reorder once preset levels are reached. When these presets (or reorder triggers) are reached, the CMMS generates alerts to allow for timely reordering and restocking. This level of real-time procurement prevents shortages, minimizes emergency procurement costs, and enables a more efficient supply chain.
Increased Equipment Monitoring and Uptime, and Reduced Downtime: Effective spare parts management programs allow maintenance managers and practitioners to review detailed reports on past maintenance activities and identify parts that frequently fail or require replacement. Using this information, parts procurement can be tailored to the sourcing of more reliable spare parts, contributing to increased equipment uptime and reduced overall downtime.
Resilience: A resilient organization can anticipate, adapt to, and recover from disruptions, and effective spare parts management is a crucial part of this process.
II. Spare Parts Maintenance Programs
The key components of a successful spare parts management program include:
A well-developed spare parts management plan (SPMP).
Technology for tracking and ordering inventory.
Development of effective vendor relationships.
Use of evaluation metrics with key performance indicators.
A. Spare parts management plan: Specific to contracted O&M programs, a functional SPMP will be the operational plan for the contract. A sample outline of an SPMP is presented below:
1. Contractual Requirements: Define all aspects of the contract and expectations.
Contract terms: Duration, including transitions in and out of the contract.
Spare parts scope: Clearly define the contract scope of spare parts, including who bears the cost of replenishment, expectations on inventory, access, and organization.
Minimum spare parts list: Establish a minimum list of essential spare parts, considering factors like component criticality, lead times, and cost-benefit analysis.
Warranty considerations: Ensure the O&M service provider does not void equipment warranties when purchasing or exchanging spare parts.
2. Responsibilities: Clearly define the roles and responsibilities by functional category:
Ownership: The asset owner typically retains ownership of the spare parts to maintain control over the asset's value.
Maintenance, storage, and replenishment: The contractor is usually responsible for these elements.
Documentation via CMMS or other means.
3. Inventory Assessment and Prioritization:
Identify critical components and assess their criticality to operations and usage frequency.
Develop a prioritization scale based on their criticality and usage.
Stocking plan shall be based on the spare parts prioritization activity.
Allow a transition period for the O&M contractor to assess equipment degradation and identify critical spares needed to meet contractual availability guarantees.
Conduct a complete spare parts audit to accurately track existing inventory, conditions, and locations.
4. Inventory Control System:
Implement a system (e.g., CMMS) to track inventory levels (i.e., inventory management), set reorder points, manage storage, and ensure accuracy.
Populate and update systems as parts move in and out.
5. Procurement and Logistics:
Establish reliable procurement processes and designate procurement responsibility.
Manage supplier relationships.
Optimize logistics for timely delivery.
6. Storage and Accessibility:
Implement organized and labeled storage areas for efficient retrieval and to minimize errors.
Conduct periodic system audits for accuracy, validity, and documentation.
7. Procedures and Training:
Implement standardized operating procedures for spare parts management.
Staff shall be trained in inventory systems, reorder processes, and safety protocols.
8. Collaboration and Communication:
Enable communication and collaboration between maintenance, procurement, and inventory management teams.
Inform management with relevant interactions.
9. Performance Monitoring and Optimization:
Regularly review and update inventory, analyze data to forecast future needs, and optimize inventory levels.
B. Inventory Tracking and Ordering Technology: A key element of a modern and effective spare parts management program is the use of automatic tracking, trending, and reorder systems. These systems come in the form of CMMS or other Enterprise Asset Management (EAM) systems and are often commercial off-the-shelf applications but can also be developed in-house when the skillset and/or need exists.
Whether off-the-shelf or in-house, these technologies can offer a multitude of benefits, including:
Inventory tracking and reorder: Track inventory in real time, automate work orders, evaluate supplier performance, schedule maintenance, and manage spare parts.
Predictive Analytics: Leverage data from CMMS/EAM systems and other sources to anticipate spare parts demand and optimize inventory levels.
Failure Mode Analysis: Analyze potential failure modes to understand which parts are most likely to fail and require replacement.
Barcoding or Radio Frequency Identification: Implement these technologies to automate tracking of spare parts throughout the supply chain.
Obsolescence Management: Develop strategies to manage obsolescence, including lifecycle monitoring and collaboration with suppliers.
All modern inventory management systems, whether contracted or in-house, shall make productive use of computerized maintenance management to the greatest extent practicable.
C. Vendor Relationships: Effective vendor relationships are crucial for success in the maintenance industry. They go beyond transactional exchanges, growing into collaborative partnerships that drive efficiency, enhance service quality, and reduce costs.
In developing these relationships, the following best practices should be considered:
Select Vendors Carefully: Thoroughly evaluate potential vendors based on reliability, quality, financial stability, compliance, and track record. Choose vendors aligned with your business goals and values.
Foster Open Communication and Collaboration: Maintain regular and transparent communication, share long-term goals, and establish a culture of trust and open dialogue.
Negotiate Favorable Contracts: Focus on the total value proposition, including quality, support, and long-term partnership benefits, not just the upfront cost.
Dual Sourcing: Consider establishing dual sourcing agreements for critical parts to mitigate risks associated with reliance on a single supplier.
Address Conflicts Promptly and Professionally: Implement effective conflict resolution techniques like interest-based negotiation and regular performance reviews to address issues collaboratively and maintain a healthy relationship.
Invest in Training: Equip your team with skills in negotiation, contract analysis, performance tracking, and relationship building to maximize the value from vendor interactions.
Track Performance and Provide Feedback: Regularly monitor vendor performance against established key performance indicators (KPIs) and provide constructive feedback for continuous improvement.
By focusing on these best practices, businesses in the maintenance industry can transform their vendor relationships into strategic partnerships, achieving greater operational efficiency, enhancing service quality, and driving long-term success.
D. Evaluation Metrics: Key Performance Indicators (KPIs) for spare parts management should allow for uniform evaluation of both the process and the contractor. It is important to track the relevant KPIs specific to your situation or application. The below KPIs cover a broad spectrum of possible performance metrics.
Lead Time for Parts Procurement: This tracks the time it takes to procure spare parts, starting when the part needs are identified until the parts arrive in inventory. Shorter lead times ensure that tasks are completed on time.
Spare Parts Availability Rates: The availability rate is a measure of the time that the right parts are available when needed for repairs or scheduled maintenance. Higher availability reduces delays for maintenance tasks.
Inventory Turnover Rate: Measure how quickly spare parts are being used and replaced. A higher turnover rate indicates efficient use of inventory while a lower rate can be an indication that excess value is being tied up in overstocked parts.
Cost Per Order: The cost per order tracks the total cost of spare parts, including all procurement-related costs, shipping, and handling. Reducing this cost through efficiency procurement, scheduling and order-entry, and receiving can lead to savings.
Order Accuracy: Measures the percentage of orders delivered correctly. High accuracy reduces returns and improves efficiency.
Obsolete Inventory Percentage: Calculates the percentage of inventory that is no longer usable, out-of-warranty, etc. Reducing this percentage minimizes waste and improves efficiency.
Carrying Cost of Inventory: Assesses the total cost of holding inventory including storage, insurance, and depreciation. Lower costs improve program economic efficiency.
Order Accuracy: Measures the percentage of orders delivered correctly. High accuracy reduces returns and improves efficiency.
Spare parts management is a cross-cutting activity impacting all aspects of O&M. In the contracted O&M setting, an effective spare parts management program will go a long way toward fostering an efficient overall O&M program.
Contract Transition
A successful O&M contract transition requires careful timing, attention to detail, and complete documentation. This requires effective transition of the existing contractor while monitoring the start of the new contract/contractor.
A. Contract Planning
Productive contract transitions rely on the development and execution of a contract transition plan (CTP). The elements of a CTP will vary based on the contract type, duration, and included services and systems. A CTP will typically include:
Transition objectives
Owner expectations.
Maintaining continuity of service during the process.
Minimizing the impact on occupants, systems, processes, and supply chains.
Transition schedule
Detailed task schedule for both outgoing and incoming contractors.
Consideration for overlap period for the incoming contractor for proper hand-off, training, and acceptance.
A timeline shall be developed, agreed upon, and followed closely. Durations will vary based on the size and complexity of the schedule. Typical transition timelines are in the 3 to 6 month window.
Communications planning
Identification of points of contact, roles, and responsibilities of the owner, the outgoing contractor, and the incoming contractor.
Risk management planning
Identifying sensitive information, records, equipment, and procedures.
Managing outgoing contractor’s performance at conclusion.
Having all parties agree to final handoff.
Final transition checklists
Each contractor shall have a separate checklist.
Checklists shall be completed, submitted, and reviewed, and shall require a final customer sign-off before the transition is complete.
While contractor transition checklists are generally contract-specific, the checklists at the end of this section provide some common elements found in the transition-out and transition-in procedures (FEMP 2010; Government of South Australia 2023).
B. Transition Structure
The actual transition shall follow the CTP as closely as possible. The elements of the transition structure shall include the following categories:
Accepted CTP: The CTP will provide an outline of the transition steps, which shall be reviewed and accepted by both the incoming and outgoing contractors. This acceptance shall be in writing and completed well ahead (typically 1 to 3 months) of the actual transition.
Resource Identification and Allocation: Before the actual transition, surveys of existing critical and non-standard systems and processes shall be completed. Included with these surveys are the key personnel and documentation necessary for transition.
Facility System and Service Knowledge Transfer: This activity should encompass any and all critical system information, processes, and documentation, from the outgoing contractor. This will include:
Technical system and process details with documentation.
Inventory of all transfer property, government-furnished property, etc., and as-left condition.
Required training in facility systems and processes.
Warranty Matrix: Record details such as the manufacturer, supplier, warranty start and end dates, coverage terms, and contact information
System walk-downs as requested or required, including warranty inspections to establish baselines.
Risk Identification, Assessment, and Management: This element focuses on the potential risks and develops strategies to address them. Typical transition risks may include:
Contract non-compliance.
Delays in transition.
Personnel challenges/resistance to change.
Incomplete information sharing/knowledge transfer.
While many of these risks can be identified and mitigated with a functional CTP, good communication, use of technology, and complete documentation offer the best paths to success.
C. Transition Completion and Monitoring
Once the transition is completed, the new contractor shall be evaluated on the CTP transition milestones and checklist. This activity will initiate the transition completion and start of the new contract. As with any new contract/contractor, performance metrics or KPIs offer a method of contractor evaluation.
In general, KPIs shall be developed and/or updated from previous years, at the outset of the contract and in coordination with the incoming contractor. KPI categories and components shall be agreed upon in writing. Sample KPI categories include:
Operating budget to actual performance and variance.
Preventive maintenance compliance.
Response time compliance.
Preventive to corrective maintenance target compliance.
Accuracy of facilities data.
Asset inventory.
Physical condition concurrence by owner, incoming provider, and outgoing provider.
CMMS state, status, handoff.
Safety.
Quality control.
Table 1. Outgoing Contractor Transition Checklist
Outgoing Contractor Transition Action or Task | Completed Y/N | Notes |
Prepare a timeline of activities/events. | ||
Review and confirm the outgoing contractor transition requirements are understood and recognized. | ||
Review the communication plan, risk management plan, or other requirements and complete necessary actions. | ||
Retrieve relevant documents, reports, or information from outgoing contractor. | ||
Confirm that all access cards/security badges used by the contractor or sub-contracted service providers are returned. | ||
Deactivate all access systems related to the outgoing contractor, e.g., user accounts, passwords, and other access authorizations. | ||
Organize and confirm the return of any equipment and assets. | ||
Facilitate the transfer and handover of owner records to the incoming contractor. | ||
Resolve any outgoing contractor issues and non-conformances. | ||
Document and confirm date of the close-out of all claims, insurance, warranties, guarantees, etc. | ||
Conclude and archive contracts and relevant documentation. | ||
Review and record any post transition issues and non-conformances. |
Table 2. Incoming Contractor Transition Checklist
Incoming Contractor Transition Action or Task | Completed Y/N | Notes |
Organize a start-up meeting with the incoming contractor. | ||
Review and confirm the incoming contractor transition requirements are understood and recognized. | ||
Prepare a timeline of activities/events and obtain a copy of the incoming supplier’s transition plan. | ||
Confirm the specific differences between the previous contract and the new contract, e.g., changes in scope, delivery, timeframes, policies/procedures, and the contract terms and conditions. | ||
Review the communication plan, risk management plan, or other requirements and complete any necessary actions. | ||
Establish contract administration procedures and access to policies, procedures, and other instructions. | ||
Arrange access to facilities, equipment, assets, systems, e.g., including user accounts and other authorizations. | ||
Conduct staff training if the contract is new or significantly different, or if supply arrangements, subcontractors, etc., will change. | ||
Ensure all contractual, legislative, and environmental requirements are identified and addressed with the transition. | ||
After all documents, processes, and inspections are complete, review and record, and post-transition findings. |
Conclusions and Next Steps
The results of this effort highlight significant potential to reduce time, complexity, and effort in improving O&M contract language. The user-selectable contract language provided in the O&M Contracts Templates web page supports standardization and implementation of multiple O&M approaches across sites, departments, or agencies. Leveraging the provided language may benefit overburdened federal contracting staff who are experiencing increased administrative and technical responsibilities. This information is presented in a straightforward manner, with templates, facilitating inclusion (e.g., cut and paste) into new and existing O&M contracts.