- Best Practices for Equipment O&M
-
O&M Best Practice Issue Discussions
- Advanced Maintenance Approach: Reliability Centered Maintenance
- Applying Key Performance Indicators
- Comprehensive O&M Program
- Contract Challenges and Improvements
- Cybersecurity for O&M Systems
- Existing Building Commissioning Procurement
- Healthy Building O&M
- Integrating and Analyzing Building Information to Support O&M
- Maintenance Approaches
- OMETA: An Integrated Approach to Operations, Maintenance, Engineering, Training, and Administration
- Prioritizing O&M Actions
- Re-tuning Buildings
- O&M Contracting
- Tools
- Glossary
O&M Downloadable Contract Templates
This web page contains equipment-specific templates for both prescriptive and performance-based approaches to operations and maintenance (O&M) contracting. Each customizable template provides the language to be inserted into the technical service contract or statement of work (SOW) sections of the larger O&M contract.
For a full description of prescriptive and performance-based contract approaches, see Introduction to O&M Contract Tool. For an introduction to O&M contracting structure and other contracting details, see O&M Contract Guidance and Best Practices.
IMPORTANT: Each template contains highlighted words {in brackets} that federal agencies are expected to add, remove, edit, and/or change to fit their needs and requirements.
| Technology | Prescriptive-based O&M Contract Template | Performance-based Contract Template |
| Chillers Systems | FilePrescriptive-based Chiller Procedures
(25.46 KB)
| FilePerformance-based Chiller Procedures
(24.86 KB)
|
| Air Distribution Systems | File | File |
| Lighting Systems | File | FilePerformance-based Lighting System Procedures
(18.25 KB)
|
| Boiler Systems | FilePrescriptive-based Boiler Procedure.docx
(48.69 KB)
| FilePerformance-based Boiler Procedures
(20.11 KB)
|
| Air-Source Heat Pumps | File | File |
| Ground-Source Heat Pumps | File | |
| Cooling Towers | ||
| Service Water Heating Systems | File |