Skip to main content

PNNL

  • About
  • News & Media
  • Careers
  • Events
  • Research
    • Scientific Discovery
      • Autonomous Science
      • Biology
        • Chemical Biology
        • Computational Biology
        • Ecosystem Science
        • Integrative Omics
          • Advanced Metabolomics
          • Chemical Biology
          • Mass Spectrometry-Based Measurement Technologies
          • Spatial and Single-Cell Proteomics
          • Structural Biology
        • Microbiome Science
          • Biofuels & Bioproducts
          • Human Microbiome
          • Soil Microbiome
          • Synthetic Biology
        • Predictive Phenomics
        • Toward a Standard Model of Biology
        • Human Health
          • Cancer Biology
          • Exposure Science & Pathogen Biology
      • Earth & Coastal Sciences
        • Global Change
        • Atmospheric Science
          • Atmospheric Aerosols
          • Human-Earth System Interactions
          • Modeling Earth Systems
        • Coastal Science
        • Ecosystem Science
        • Subsurface Science
        • Terrestrial Aquatics
      • Materials Sciences
        • Materials in Extreme Environments
        • Nondestructive Examination
        • Precision Materials by Design
        • Science of Interfaces
        • Smart Advanced Manufacturing
          • Cold Spray
          • Friction Stir Welding & Processing
          • ShAPE
      • Nuclear & Particle Physics
        • Dark Matter
        • Neutrino Physics
        • Fusion Energy Science
      • Quantum Information Sciences
      • Chemistry
        • Computational Chemistry
        • Chemical Separations
        • Chemical Physics
        • Catalysis
      • Fusion Energy Science
    • Energy Resiliency
      • Critical Minerals and Materials
        • Replacement
        • Separations and Recovery
        • Supply Chain Modeling
      • Electric Grid Modernization
        • Emergency Response
        • Grid Analytics
          • AGM Program
          • Tools and Capabilities
        • Grid Architecture
          • Basic Terms & Principles
          • Resource Library
        • Grid Cybersecurity
        • Grid Energy Storage
        • Transmission
        • Distribution
      • Energy Efficiency
        • Appliance and Equipment Standards
        • Building Energy Codes
        • Building Technologies
          • Advanced Building Controls
          • Advanced Lighting
          • Building-Grid Integration
        • Commercial Buildings
        • Federal Buildings
          • Federal Performance Optimization
          • Resilience and Security
        • Residential Buildings
          • Building America Solution Center
          • Energy Efficient Technology Integration
          • Home Energy Score
        • Energy Efficient Technology Integration
      • Energy Storage
        • Electrochemical Energy Storage
        • Flexible Loads and Generation
        • Grid Integration, Controls, and Architecture
        • Regulation, Policy, and Valuation
        • Science Supporting Energy Storage
        • Chemical Energy Storage
      • Environmental Management
        • Waste Processing
        • Radiation Measurement
        • Environmental Remediation
      • Fossil Energy
        • Subsurface Energy Systems
        • Advanced Hydrocarbon Conversion
      • Nuclear Energy
        • Fuel Cycle Research
        • Advanced Reactors
        • Reactor Operations
        • Reactor Licensing
        • Nondestructive Examination
      • Renewable Energy
        • Solar Energy
        • Wind Energy
          • Wind Resource Characterization
          • Wildlife and Wind
          • Wind Systems Integration
          • Wind Data Management
          • Distributed Wind
        • Marine Energy
          • Environmental Monitoring for Marine Energy
          • Marine Biofouling and Corrosion
          • Marine Energy Innovation
          • Marine Energy Resource Characterization
          • Testing for Marine Energy
        • Hydropower
          • Environmental Performance of Hydropower
          • Hydropower Cybersecurity and Digitalization
          • Hydropower and the Electric Grid
          • Materials Science for Hydropower
          • Pumped Storage Hydropower
          • Water + Hydropower Planning
        • Grid Integration of Renewable Energy
        • Geothermal Energy
          • Geothermal Materials Research
      • Transportation
        • Bioenergy Technologies
          • Algal Biofuels
          • Aviation Biofuels
          • Waste-to-Energy and Products
        • Hydrogen & Fuel Cells
        • Vehicle Technologies
          • Emission Control
          • Energy-Efficient Mobility Systems
          • Lightweight Materials
          • Vehicle Electrification
          • Vehicle Grid Integration
    • National Security
      • Chemical & Biothreat Signatures
        • Contraband Detection
        • Pathogen Science & Detection
        • Explosives Detection
        • Threat-Agnostic Biodefense
      • Cybersecurity
        • Discovery and Insight
        • Proactive Defense
        • Trusted Systems
      • Nuclear Material Science
      • Nuclear Nonproliferation
        • Radiological & Nuclear Detection
        • Nuclear Forensics
        • Ultra-Sensitive Nuclear Measurements
        • Nuclear Explosion Monitoring
        • Global Nuclear & Radiological Security
      • Stakeholder Engagement
        • Disaster Recovery
        • Global Collaborations
        • Legislative and Regulatory Analysis
        • Technical Training
      • Systems Integration & Deployment
        • Additive Manufacturing
        • Deployed Technologies
        • Rapid Prototyping
        • Systems Engineering
      • Threat Analysis
        • Advanced Wireless Security
          • 5G Security
          • RF Signal Detection & Exploitation
        • Border Security
        • Internet of Things
        • Maritime Security
        • Millimeter Wave
        • Mission Risk and Resilience
    • Data Science & Computing
      • Artificial Intelligence
      • Graph and Data Analytics
      • Computational Mathematics & Statistics
      • Future Computing Technologies
        • Adaptive Autonomous Systems
    • Science & Technology Strategy
    • Publications & Reports
    • Featured Research
  • People
    • Inventors
    • Lab Leadership
    • Lab Fellows
    • Staff Accomplishments
  • Partner with PNNL
    • Education
      • Undergraduate Students
      • Graduate Students
      • Post-graduate Students
      • University Faculty
      • University Partnerships
      • K-12 Educators and Students
      • STEM Education
        • STEM Workforce Development
        • STEM Outreach
      • Internships
    • Community
      • Philanthropy
      • Volunteering
    • Industry
      • Why Partner with PNNL
      • Explore Types of Engagement
      • How to Partner with Us
      • Available Technologies
      • Procurement
      • Technology Ombuds
  • Facilities & Centers
    • All Facilities
      • Atmospheric Radiation Measurement User Facility
      • Electricity Infrastructure Operations Center
      • Energy Sciences Center
      • Environmental Molecular Sciences Laboratory
      • Grid Storage Launchpad
      • Institute for Integrated Catalysis
      • Interdiction Technology and Integration Laboratory
      • PNNL Portland Research Center
      • PNNL-Seattle
      • PNNL-Sequim (Marine and Coastal Research)
      • Radiochemical Processing Laboratory
      • Shallow Underground Laboratory

O&M Best Practices

  • Best Practices for Equipment O&M
    • Automatic Transfer Switches
    • Air-Side Economizers
    • Ground Source Heat Pump
    • Modular Boiler Systems
    • Onsite Wind Turbines
    • Solar Photovoltaic
    • Solar Water Heating Systems
    • Standby Generators
    • Unitary HVAC Equipment
    • Variable Air Volume Systems
    • Variable Speed Drives
  • O&M Best Practice Issue Discussions
    • Advanced Maintenance Approach: Reliability Centered Maintenance
    • Applying Key Performance Indicators
    • Comprehensive O&M Program
    • Contract Challenges and Improvements
    • Cybersecurity for O&M Systems
    • Existing Building Commissioning Procurement
    • Healthy Building O&M
    • Integrating and Analyzing Building Information to Support O&M
    • Maintenance Approaches
    • OMETA: An Integrated Approach to Operations, Maintenance, Engineering, Training, and Administration
    • Prioritizing O&M Actions
    • Re-tuning Buildings
  • O&M Contracting
    • Introduction to Contract Tool
    • Contract Guidance and Best Practices
    • Downloadable Contract Templates
  • Tools
    • Existing Building Commissioning Decision Tool
    • Re-Tuning Candidate Checklist
    • Small Building O&M Checklist
  • Glossary

Breadcrumb

  1. Home
  2. Projects
  3. O&M Best Practices

Introduction to O&M Contract Tool

Introduction

The Technical Specifications for Contract Language for Operations and Maintenance (O&M) Services are designed to help federal agencies create contract language suitable for inclusion in existing and proposed O&M contracts. The templates, to be customized by the agency (see brackets with words highlighted in yellow), can be found here: O&M Contracts Templates. 

These customizable templates focus on supplementing existing (or proposed) contracts, enabling the development of site-specific prescriptive or performance-based O&M contract language.

Provided templates are not designed to generate or replace the complete O&M contract, nor do they address the legal or logistical elements of the contract—those sections are best prepared by each agency’s contracting officer (CO), often with support of a contract specialist (CS). Rather, each customizable template provides the language to be inserted into the technical service contract or statement of work (SOW) sections of the larger O&M contract.

The customizable templates are intended to:

  1. Reduce the time, complexity, and level of effort by offering technology-specific best practices to improve the development of an O&M services contract.
  2. Provide comprehensive (and customizable) contract language designed to be adaptable to specific agency, site, equipment, and facility O&M needs. This will consider legislative requirements while providing a documented (metrics-based) path to the O&M aspects of energy and water efficiency, as well as improved system resilience, availability, and reliability.

Statements of Work/Performance Work Statements

As described in O&M Contract Guidance and Best Practices, an O&M contract can come in several different forms and formats. While different in appearance, many O&M contracts contain similar sections, content, requirements, and references. The downloadable templates are primarily intended to interface with the SOW or the “Performance Work Statement” element of the overall O&M contract. The SOW content, usually found in Section C of Part I of the overall contract, delineates the scope of the O&M services and administrative aspects of the contract.

A standard outline of Section C will often include (GSA 2022; U.S. Army 2009): 

  • Section C-1: General Information
  • Section C-2: Definitions
  • Section C-3: Government-Furnished Property and Services
  • Section C-4: Contractor-Furnished Items
  • Section C-5: Operations-Specific Requirements
  • Section C-6: Maintenance-Specific Requirements
  • Section C-7: Administrative Instructions
  • Section C-8: Publications, Technical Exhibits, and Cited Standards

Depending on the structure, the equipment-specific contract language will usually be found in Section C-6: Maintenance-Specific Requirements.

Contracting Approaches to Maintenance-Specific Requirements

Provided templates contain SOW contract language for technical O&M processes and procedures at the system, equipment, and/or component levels for eight example technologies. For each technology, O&M specifications are provided for two maintenance approaches: prescriptive-based or performance-based. 

  1. Prescriptive-based O&M Contract. This more traditional approach requires a contractor to follow a well-defined and standardized set of actions and/or procedures at specified frequencies as explained in the contract. A prescriptive approach will often use standardized checklists that the contractor follows at specified intervals (regardless of need).

    This approach can maintain the equipment’s warranty and help extend its useful life when the manufacturer’s prescribed maintenance schedule is followed. However, it can also result in unnecessary maintenance activities, inefficient use of staff time and resources, and limited innovation because it does not fully leverage the contractor’s expertise or encourage process improvements.

  2. Performance-based O&M Contract. This approach focuses on desired outcomes or results rather than specific procedures. It gives the contractor flexibility in determining how to achieve the required performance. Under this model, the customer contracts for specific services and measurable outcomes, not resources. As such, the contractor flexibility is increased, customer oversight is decreased, and management attention shifts toward results and performance.

    In the performance-based approach, the SOW contains explicit, measurable performance requirements (e.g., metrics; the “what”), eliminates process-oriented requirements (the “how”), and includes only minimally essential reporting requirements that are based on risk. The agency employs a measurement and verification method that is clearly communicated to the contractor and where the contractor is held fully accountable using key performance indicators as shown in section IX, Key Performance Indicators and Metrics. 

However, performance-based contracts are complex to draft, can involve higher monitoring costs, and may increase the risk of contractor disputes. The advantages and disadvantages of both contract types must be carefully considered when choosing an O&M approach. Aspects of each approach are summarized in Table A.

Table A. Comparison of O&M Contract Approaches 

Aspect

Prescriptive-Based O&M Contract

Performance-Based Contract

Core PhilosophySpecifies how the work must be performed (detailed procedures and frequencies)Specifies what results/outcomes must be achieved (focus on performance metrics)
Contractor RoleFollows standardized checklists and fixed schedules, regardless of actual needGives flexibility to determine methods, leveraging expertise and innovation
Customer OversightProvides higher insight: monitors adherence to prescribed steps Offers lower insight: focuses on verifying results rather than processes
Warranty & Equipment LifeStrong protection when manufacturer’s prescribed maintenance is followedDepends on contractor’s ability to meet performance standards; may require additional verification
Efficiency & CostCan result in unnecessary maintenance and inefficient use of resources Can reduce overall costs by avoiding unneeded work and enabling innovative solutions
InnovationAllows for limited innovation—contractor follows fixed proceduresEncourages innovation—contractor can propose and apply better methods
ComplexitySimpler to draft and administer More complex to draft, measure, and verify
RisksWasted activities, poor use of staff time, missed opportunities for improvementHigher monitoring costs, potential contractor dispute, risk of unclear metrics
Best Suited For Equipment with strict warranty requirements, regulatory compliance, or low-risk/standard assets Mature programs where outcomes can be clearly defined and measured

The contract templates provided for both prescriptive and performance approaches also allow for a hybrid approach, which combines prescriptive and performance mechanisms. For example, contracts can be very specific (and prescriptive) with certain systems (e.g., high-reliability and/or sensitive equipment) while a performance-based approach can be selected for systems not needing such specificity and prescription.

Key Performance Indicators

In addition to contract language templates, key performance indicators (KPIs) are included for each example technology. Developing and applying KPIs is a valuable way for building owners, contractors, and their O&M organizations to measure performance and identify areas in need of improvement.

In general, a KPI can be defined as a numeric value used to measure and evaluate the progress toward a defined goal or objective. KPIs are typically generated by combining one or more relevant values into a mathematical relationship to express the performance, condition, or efficiency of a part, system, facility, or organization (PNNL 2021). 

KPIs span the topic areas of planning, scheduling, execution, reliability, response, organization, cost, performance, and safety, among others. KPIs fall into one of two distinguishing categories: a leading KPI or a lagging KPI. 

  • A leading KPI is usually process-specific and is a measure of performance prior to change or degradation. Leading KPIs are used most often to track and define future progress and success. An example of a leading KPI is the percentage of maintenance work orders requiring rework. 
  • A lagging KPI is a measure of what has already happened and how it impacts the system, process, or business. Lagging KPIs provide an indication of past success or deficiency. An example of a lagging KPI is the mean time between failure.

The tables below are organized to span the range from generic KPIs (relevant to cross-site application) to technology-specific KPIs that are relevant to only the technology presented. 

To make full use of KPIs, some reference or target needs to be developed or provided. These references or targets are often referred to as metrics or benchmarks. Metrics and benchmarks can be presented as target values but are often presented as ranges or percentages. The third column in the tables below highlights the reference metrics for each KPI (PNNL 2021). 

When developing the scope of work, these KPIs can be reviewed and considered for inclusion in the contract language.

Table B. High-Level Site-Wide/Facility Specific KPIs and Metrics

Site-Wide or Facility-Specific

Area

KPI

Target Metric

Energy UseEnergy Use Intensity (EUI): Annual total energy use over relevant conditioned square footage (1)Site-specific, within targeted range
Energy Star Portfolio Manager Score (1)Site-specific, within targeted range

Area

KPI

Target Metric

Water UseWater Use Intensity (WUI): Annual total water-use over relevant square footage (2)Site-specific, within targeted range

Area

KPI

Target Metric

Greenhouse GasGHG Emissions Generated: Annual total GHG, equivalency of CO2 metric tons (3), plus other?Site-specific, within targeted range

Area

KPI

Target Metric

Occupant Related

Hot Calls: Occupant calls totaled over time interval (month, quarter, year)

Site-specific, within targeted range

Cold Calls: Occupant calls totaled over time interval (month, quarter, year)

Site-specific, within targeted range
Satisfaction Rating: Occupant complaints totaled over time interval (month, quarter, year)Site-specific, within targeted range
Notes: Add: (1) Reference EUI definition. (2) Reference WUI definition. (3) Reference GHG requirements

Table C. O&M Program Leading KPIs and Metrics

Leading KPIs

Area

KPI

Target Metric

Work Planning

Planned Downtime: Planned or scheduled downtime or shutdown over total uptime

Target <10%, trending downward

Area

KPI

Target Metric

Work Execution 

Schedule: Work orders (total number) with defined schedule

Target >95%, trending upward

Backlog Percentage: Work orders in backlog status over total work orders

Target <5%, trending downward

Rework Percentage: Percentage of work orders in rework status; work orders in rework status over total work orders

Target <3%, trending downward

Area

KPI

Target Metric

Work Administration

Training: Number of training events or days/hours over number of staff

Industry specific, trending upward

Proficiency: Staff carrying certification over total number of staff

Industry specific, trending upward

Table D. O&M Program Lagging KPIs and Metrics

Lagging KPIs

Area

KPI

Target Metric

Equipment Effectiveness

Availability: Equipment uptime over expected operating time including planned downtime

Target >90%, trending upward

Downtime: Unplanned equipment failures/shutdowns over planned equipment failures/shutdowns 

Target >90%, trending upward

Mean Time Between Failure: Total operating time over number of failures

Industry/system specific, trending upward

Occupant Satisfaction: Occupant complaints totaled over time interval (month, quarter, year)

Industry specific, trending downward

Occupant Satisfaction: Occupant complaints totaled over time interval (month, quarter, year)

Industry specific, trending downward

Area

KPI

Target Metric

Maintenance Cost/Financial Effectiveness

Maintenance Cost: Total maintenance cost over cost of previous year/s

Industry specific, trending downward

Facility Condition: Total maintenance cost over replacement asset value of equipment

Target <3%, trending downward

Area

KPI

Target Metric

Programmatic Effectiveness

Corrective Maintenance: Corrective maintenance hours over total maintenance hours

Target <10% to 20%, trending downward

Preventive Maintenance: Preventive maintenance hours over total maintenance hours

Target >25% to 35%, trending steady to upward

Condition-based/Predictive Maintenance: Predictive maintenance hours over total maintenance hours

Target >45% to 55%, trending upward

Area

KPI

Target Metric

Safety and Environment Effectiveness

Safety Severity: Hours lost to injuries for maintenance personnel over total hours worked by maintenance personnel 

Industry specific, trending downward

Environmental Effectiveness: Number of reportable environmental events over total hours worked by maintenance personnel 

Industry specific, trending downward

Conclusions and Next Steps

The collection of downloadable templates offers O&M specifications for both prescriptive-based paths (traditional O&M activities following well-defined actions and frequencies) and performance‑based paths (a contemporary O&M approach relying on outcome-based performance activities with definable metrics). 

Additionally, these specifications can be combined into a hybrid approach using specifications from both prescriptive and performance paths to meet unique equipment needs. Coupled with each technology is a metric and key-performance indicator table. These tables offer a selection of editable metrics providing options to track contractor activity and performance.

The contract language and KPI metrics can be implemented into the technical service contract or SOW sections of the larger O&M contract. For additional information on O&M contracts, see O&M Contract Guidance and Best Practices.

O&M contract templates can be downloaded at O&M Contracts Templates.

IMPORTANT: The downloadable templates contain highlighted words {in brackets} that federal agencies are expected to add, remove, edit, and/or change in the template language to fit their needs and requirements.

Research topics

Federal Buildings
Energy Efficiency
Resilience and Security
Federal Performance Optimization
Building Technologies

PNNL

  • Get in Touch
    • Contact
    • Careers
    • Doing Business
    • Environmental Reports
    • Security & Privacy
    • Vulnerability Disclosure Policy
    • Notice to Applicants
  • Research
    • Scientific Discovery
    • Energy Resiliency
    • National Security
Subscribe to PNNL News
Department of Energy Logo Battelle Logo
Pacific Northwest National Laboratory (PNNL) is managed and operated by Battelle for the Department of Energy
  • YouTube
  • Facebook
  • X (formerly Twitter)
  • Instagram
  • LinkedIn