Resources
Fan X., S.G. Aksoy, D. Wang, Q. Huang, J.P. Ogle, A. Tbaileh, and R. Huang. 2019. "Synthetic Communication Network Testbed for Prompt Power System Recovery considering Grid and Communication Network Interdependency." Submitted to the 53 Hawaii International Conference on System Sciences.
Tao Fu, Dexin Wang, Xiaoyuan Fan, Qiuhua Huang, “Component Importance and Interdependence Analysis for Transmission, Distribution and Communication Systems”. DOI: arxiv-2101.07306
X. Fan et al., "Automated Realistic Testbed Synthesis for Power System Communication Networks based on Graph Metrics," 2020 IEEE Power & Energy Society Innovative Smart Grid Technologies Conference (ISGT), 2020, pp. 1-5, doi: 10.1109/ISGT45199.2020.9087672.
References
- Korkali M, Veneman JG, Tivnan BF, Bagrow JP, and Hines PD. “Reducing Cascading Failure Risk by Increasing Infrastructure Network Interdependence.” Scientific Reports 7(44499), 2017.
- Illinois 200-Bus System: ACTIVSg200, available at https://electricgrids.engr.tamu.edu/electric-grid-test-cases/activsg200/
Lab-Level Communications Priority Topics
Grid