News
New All-Liquid Iron Flow Battery for Grid Energy Storage
A new iron-based aqueous flow battery shows promise for grid energy storage applications.
Publication
PNNL to Install 24-Hour Flow Battery in Richland Campus
This is the first time a flow battery with 24-hour discharge capacity will be deployed and tested in a field environment.
Page
Apply to Test Battery Technology
As demand for an efficient and reliable grid infrastructure grows, new technologies aim to improve operations with existing infrastructure. Grid Storage Launchpad stands ready to validate the performance of these new batteries and systems.
Page
Testing and Validation Room 2
T&V2 in the Grid Storage Launchpad is designed for testing grid-scale battery systems
News
New Energy Storage System Strengthens Air Force Base’s Resilience
PNNL teamed up with multiple agencies to install a battery energy storage system at a South Dakota Air Force base.