September 22, 2026
Report
U.S. Offshore Wind Energy Noise Reduction Associated with Installation of Fixed-Bottom Foundations: Workshop Report
Abstract
As offshore wind energy development grows in the United States, solutions are needed to reduce the underwater noise and substrate vibration generated during fixed-bottom turbine installation to help protect marine life. Monopiles are currently the main turbine foundation type installed globally and impact pile driving, the primary installation method, can be a major source of noise and vibration generation during wind farm construction. Opportunities exist to reduce the amount of noise and vibration produced during future offshore wind farm development. The use of alternative foundation types and installation methods, as well as innovative noise abatement technologies, would help reduce the potential detrimental effects on sensitive marine species. To explore these opportunities, the Department of Energy’s Wind Energy Technologies Office, in collaboration with the Bureau of Ocean Energy Management and the National Oceanic and Atmospheric Administration, funded the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory to organize, host, and facilitate a virtual workshop in December 2022. The goal of the workshop was to gather input from the offshore wind energy community on noise reduction strategies for the installation of fixed-bottom offshore wind turbines in U.S. waters across multiple regions, including the U.S. Atlantic Coast, Gulf of Mexico, and Great Lakes to inform recommendations on future research. The joint lab team convened industry representatives, subject matter experts, and regulators to discuss potential pathways to reduce noise and vibration associated with fixed-bottom turbine installation, including the practicality of using alternative foundations and installation methods, the effectiveness of noise abatement technologies, as well as research and monitoring needs. In preparation for the workshop, the team invited experts to be part of a steering committee and worked with its members to help focus activities to meet the workshop goals. Additional pre-workshop activities included developing the invitee list and workshop agenda, reviewing existing Construction and Operations Plans (COP) for proposed offshore wind projects, distributing a brief questionnaire to industry representatives, and drafting the workshop discussion questions and Mural boards. In total, 128 workshop participants provided over 600 comments in response to the 17 group discussion questions used over two workshop sessions. Overarching recommendations highlighted across themes included future investments to provide data sharing, consistency, transparency, and opportunities for sharing best available science, knowledge, and expertise. The joint lab team synthesized the comments and identified four key research and development themes that could help advance the successful implementation of noise and vibration reduction strategies (see report). This report provides an overview of the workshop goals and scope, reviews the pre-workshop activities, presents brief summaries of participant feedback, and concludes with detailed research themes and recommendations for future investments. Appendix A includes the group discussion questions, Appendix B includes the results of the COP review, and Appendix C includes the results of the industry questionnaire. Overall, there was a high level of interest and engagement in the workshop. The sessions provided an opportunity for significant exchange of information between workshop participants from across sectors. Participants identified a variety of opportunities for next steps towards the noise reduction of offshore wind turbine installation in U.S. waters, including recommendations for future investments to provide certainty in the use of new technologies associated with alternative foundation types, noise abatement systems, and efficacy monitoring.Published: September 22, 2026