December 9, 2006
Report

Vogtle Electric Generating Plant ETE Analysis Review

Abstract

Under contract with the Nuclear Regulatory Commission (NRC), staff from Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratory (SNL)-Albuquerque reviewed the evacuation time estimate (ETE) analysis dated April 2006 prepared by IEM for the Vogtle Electric Generating Plant (VEGP). The ETE analysis was reviewed for consistency with federal regulations using the NRC guidelines in Review Standard (RS)-002, Supplement 2 and Appendix 4 to NUREG-0654, and NUREG/CR-4831. Additional sources of information referenced in the analysis and used in the review included NUREG/CR-6863 and NUREG/CR-6864. The PNNL report includes general comments, data needs or clarifications, and requests for additional information (RAI) resulting from review of the ETE analysis.

Revised: September 24, 2009 | Published: December 9, 2006

Citation

Diediker N.H., and J.A. Jones. 2006. Vogtle Electric Generating Plant ETE Analysis Review Richland, WA: Pacific Northwest National Laboratory.