This document contains the Utility Assessment Report (UAR) for the Phase 2 operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Joint Capability Technology Demonstration (JCTD). The UAR for Phase 2 shows that the SPIDERS system was able to meet the requirements of the Implementation Directive at Ft. Carson.
Revised: February 17, 2015 |
Published: January 1, 2014