January 1, 2014
Report

Utility Assessment Report for SPIDERS Phase 2: Ft. Carson (Rev 1.0)

Abstract

This document contains the Utility Assessment Report (UAR) for the Phase 2 operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Joint Capability Technology Demonstration (JCTD). The UAR for Phase 2 shows that the SPIDERS system was able to meet the requirements of the Implementation Directive at Ft. Carson.

Revised: February 17, 2015 | Published: January 1, 2014

Citation

Barr J.L., F.K. Tuffner, M.D. Hadley, and K.P. Schneider. 2014. Utility Assessment Report for SPIDERS Phase 2: Ft. Carson (Rev 1.0) Richland, WA: Pacific Northwest National Laboratory.