September 24, 2015
Report

Prototypic Enhanced Risk Monitor Framework and Evaluation - Advanced Reactor Technology Milestone: M3AT-15PN2301054

Abstract

This research report summaries the development and evaluation of a prototypic enhanced risk monitor (ERM) methodology (framework) that includes alternative risk metrics and uncertainty analysis. This updated ERM methodology accounts for uncertainty in the equipment condition assessment (ECA), the prognostic result, and the probabilistic risk assessment (PRA) model. It is anticipated that the ability to characterize uncertainty in the estimated risk and update the risk estimates in real-time based on equipment condition assessment (ECA)will provide a mechanism for optimizing plant performance while staying within specified safety margins. These results (based on impacting active component O&M using real-time equipment condition information) are a step towards ERMs that, if integrated with AR supervisory plant control systems, can help control O&M costs and improve affordability of advanced reactors.

Revised: January 12, 2017 | Published: September 24, 2015

Citation

Ramuhalli P., E.H. Hirt, A. Veeramany, C.A. Bonebrake, W.J. Ivans, G.A. Coles, and J.B. Coble, et al. 2015. Prototypic Enhanced Risk Monitor Framework and Evaluation - Advanced Reactor Technology Milestone: M3AT-15PN2301054 Richland, WA: Pacific Northwest National Laboratory.