Pretreatment Engineering Platform Phase 1 Final Test Report

Abstract

Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes.( ) Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing was conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.

Revised: January 17, 2011 | Published: December 23, 2009

Citation

Kurath D.E., B.D. Hanson, M.J. Minette, D.L. Baldwin, B.M. Rapko, L.A. Mahoney, and P.P. Schonewill, et al. 2009. Pretreatment Engineering Platform Phase 1 Final Test Report Richland, WA: Pacific Northwest National Laboratory.