Abstract

The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Lookout Point Dam (LOP) and the acoustic imaging system at Cougar Dam (CGR) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. The general approach was a multi-step process from mount design to final system configuration. The optimization effort resulted in successful deployments of hydroacoustic equipment at LOP and CGR.

Revised: October 29, 2010 | Published: August 18, 2010

Citation

Johnson G.E., F. Khan, G.R. Ploskey, J.S. Hughes, and E.S. Fischer. 2010. Optimization of Hydroacoustic Equipment Deployments at Lookout Point and Cougar Dams, Willamette Valley Project, 2010 Richland, WA: Pacific Northwest National Laboratory.