Opportunities for Dispatchable Power Projects in the New England Independent System Operator Area

Abstract

Pacific Northwest National Laboratory (PNNL) has conducted an investigation into the feasibility of installing a battery energy storage system (BESS) behind-the-meter (BTM) at a military base located in the ISO-NE area. This report presents the findings of this assessment. In addition to the bill-reducing benefits of storage, dispatchable power could also provide potentially high-value resiliency benefits. These resiliency benefits were not evaluated here.

Revised: August 19, 2020 | Published: October 22, 2019

Citation

Fotedar V., P.J. Balducci, W.M. Warwick, D. Wu, D. Wang, and K. Mongird. 2019. Opportunities for Dispatchable Power Projects in the New England Independent System Operator Area Richland, WA: Pacific Northwest National Laboratory.