This paper is the first of a two-part sequence that proposes a general methodology for dynamic scheduling and optimal control of complex primary HVAC&R plants, which combines engineering analyses within a practical decision analysis framework by modeling risk attitudes of the operator. The paper was based on work done prior to employment by Battelle.
Revised: May 4, 2007 |
Published: January 31, 2007
Citation
Jiang W., and T.A. Reddy. 2007.General Methodology Combining Engineering Optimization of Primary HVAC & R Plants with Decision Analysis Methods--Part I: Deterministic Analysis.HVAC & R Research 13, no. 1:93-117.PNNL-SA-53934.