This report is Revision 2 of PNNL-14271. Revision 1 expanded the analysis of interstitial liquid drainage-induced gas releases to address a general retrieval scenario (the previous version of this report assumed a center-out retrieval approach and conditions). Tank waste conditions (waste volumes, interstitial liquid levels, temperatures, retained gas void fractions, etc.) were also updated in Revision 1. Revision 2 extends the analysis to address water addition rates of 110 gpm and brine pump-out rates of 110 gpm.
Revised: October 1, 2004 |
Published: September 30, 2004