May 8, 2001
Report

Final Report Recommended Actions to Reduce Electrical Peak Loads at the Marine Corps Air Station at Camp Pendleton, California

Abstract

PNNL conducted a walk-through audit of Marine Corps Air Station at Camp Pendleton. The audit inspected a significant portion of the site and identified a large number of similar energy saving opportunities across all building types.

Revised: September 30, 2009 | Published: May 8, 2001

Citation

Hail J.C., D.R. Brown, J.J. McCullough, and R.M. Underhill. 2001. Final Report Recommended Actions to Reduce Electrical Peak Loads at the Marine Corps Air Station at Camp Pendleton, California Richland, WA: Pacific Northwest National Laboratory.