Statistical methods are required in groundwater monitoring programs to determine if a RCRA-regulated unit affects groundwater quality beneath a site. This report presents the results of the statistical analysis of groundwater monitoring data acquired at B Pond and the 300 Area process trenches during a 2-year trial test period.
Revised: October 27, 2005 |
Published: June 24, 2004