August 18, 2023
Report
Electrochemical Acid Sequestration to Ease Ocean Acidification (EASE-OA) - CRADA 600 (Abstract)
Abstract
The PNNL team will coordinate logistics involved with setting up the field trial on the PNNL Sequim campus in collaboration with Ebb Carbon. Facilities on the PNNL Sequim campus are capable of pumping raw or filtered seawater from Sequim Bay at a rate ~45,000 L hr-1, which can accommodate the 4000 L hr-1 requirement of the 200 ton CO2 yr-1 Ebb Carbon marine carbon dioxide removal (mCDR) system. The primary tasks for the PNNL team are 1) laying out appropriate indoor and outdoor spaces for installing the Ebb Carbon’s mCDR system, 2) facilitating Ebb Carbon’s access to the PNNL’s seawater intake on the PNNL Sequim campus, 3) conducting mesocosm experiments within the PNNL Sequim campus laboratories to test how the brine and base discharged from the Ebb Carbon system affect marine life, and 4) facilitating Ebb Carbon access to the PNNL Sequim installation site and aiding in maintenance as needed. In addition to these tasks, the PNNL team will provide surface water quality data (e.g., salinity, temperature, pH, dissolved O2) from a monitoring station located on the pier to contextualize starting conditions of the seawater used in the mCDR process. Finally, the PNNL team will also consult with Ebb Carbon on strategies for improving overall system performance and next steps for further scaling and/or monitoring the effectiveness of the mCDR system.Published: August 18, 2023