May 23, 2026
Report
CPUC Avoided Transmission and Distribution Cost Study to Support the Avoided Cost Calculator: Avoided Transmission Costs Draft Research Plan
Abstract
Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory (LBNL) have been contracted by the California Public Utilities Commission (CPUC) Energy Division (ED) to perform a study which explores and selects an improved methodology to estimate avoided electricity transmission and distribution (T&D) infrastructure costs that can be attributed to the presence of distributed energy resources (DERs). PNNL is performing the study for avoided electricity transmission infrastructure costs and LBNL is performing the study for avoided electricity distribution infrastructure costs. This document summarizes CPUC’s research questions related to avoided transmission infrastructure costs and PNNL’s proposed technical approach to answer these questions.Published: May 23, 2026