A Fusion Nuclear Science Facility (FNSF) is a necessary complement to ITER, especially in the area of materials and components testing, needed for DEMO design development. FNSF-AT, which takes advantage of advanced tokamak (AT) physics should have neutron wall loading of 1-2 MW/m2, continuous operation for periods of up to two weeks, a duty factor goal of 0.3 per year and an accumulated fluence of 3-6 MW-yr/m2 (~30-60 dpa) in ten years to enable the qualification of structural, blanket and functional materials, components and corresponding ancillary equipment necessary for the design and licensing of a DEMO. Base blankets with a ferritic steel structure and selected tritium blanket materials will be tested and used for the demonstration of tritium sufficiency. Additional test ports at the outboard mid-plane will be reserved for test blankets with advanced designs or exotic materials, and electricity production for integrated high fluence testing in a DT fusion spectrum. FNSF-AT will be designed using conservative implementations of all elements of AT physics to produce 150-300 MW fusion power with modest energy gain (Q
Revised: October 5, 2012 |
Published: July 1, 2012
Citation
Wong C.P., V.S. Chan, A.M. Garofalo, R. Stambaugh, R. Stambaugh, M. Sawan, and R.J. Kurtz, et al. 2012.Fusion Nuclear Schience Facility-AT: A Material And Component Testing Device.Fusion Science and Technology 62, no. 1:283-288.PNNL-SA-84539.