June 30, 2008
Conference Paper

Evaluating Impacts of Wind Generation on Regulation and Load Following Requirements in the California ISO Service Area

Abstract

The paper analyzes the impact of integrating wind generation on the regulation and load following requirements of the California Independent System Operator (CAISO). These requirements are simulated and compared for the study cases with and without wind generation impacts included into the study for the years 2006 and 2010. Regulation and load following models were built based on hour ahead and 5-minutes ahead load and wind generation forecasts. In 2006, the CAISO system peaked at 50270 MW. Wind generation (at the installed capacity of 2600 MW) had limited impact on the requirement of load following and regulation in the CAISO Control Area. However, in 2010, (with an expected installed capacity of approximately 6700 MW) this impact will significantly increase. The results provide very useful information for the CAISO to adjust its scheduling and real-time dispatch systems to reliably accommodate future wind generation additions on the CAISO Control Area.

Revised: July 22, 2010 | Published: June 30, 2008

Citation

Makarov Y.V., C. Loutan, J. Ma, P. De Mello, and S. Lu. 2008. Evaluating Impacts of Wind Generation on Regulation and Load Following Requirements in the California ISO Service Area. In Windpower 2008 Conference & Exhibition, June 104, 2008, Houston, Texas., 372-377. Washington, District Of Columbia:American Wind Energy Association. PNWD-SA-8232.