Abstract

In 1999 the Pacific Gas and Electric Gas Transmission Northwest (GTN) drilled a borehole to investigate the feasibility of developing a natural gas-storage facility in a structural dome formed in Columbia River basalts in the Columbia Basin of south-central Washington State. The proposed aquifer storage facility will be an unconventional one where natural gas will be initially injected (and later retrieved) in one or multiple pervious horizons (interflow zones) that are confined between deep (>700 meters) basalt flows of the Columbia River Basalt Group. This report summarizes the results of joint investigations on that feasibility study by GTN and the US Department of Energy.

Revised: October 1, 2003 | Published: June 18, 2003

Citation

Reidel S.P., F.A. Spane, and V.G. Johnson. 2003. The Canoe Ridge Natural Gas Storage Project Richland, WA: Pacific Northwest National Laboratory.