Adaptive RAS/SPS System Setting for Improving Grid Reliability and Asset Utilization through Predictive Simulation and Controls: A Use Case for Transformative Remedial Action Scheme Tool (TRAST): Jim Bridger RAS Evaluation and Analysis
Revised: March 12, 2020 | Published: December 18, 2019