Docket No. E-999/CI-16-521 Order Conditionally Adopting Amended Technical Interconnection and Interoperability Requirements and Requiring Filings
Component
Institutional
Author
Minnesota Public Utilities Commission
Stakeholder
Minnesota Public Utilities Commission
Minnesota Public Utilities Commission Order (April 11, 2023) conditionally adopting amended Technical Interconnection and Interoperability Requirements (TIIR) for grid edge resources. These requirements establish statewide technical standards for connecting alternative energy systems to the grid, with specific focus on advanced "smart" inverters. The order specifies implementation timelines and interim requirements, while the attached TIIR document details comprehensive technical standards for equipment performance, grid protection, metering, interoperability, and testing requirements. The new standards will take full effect when IEEE 1547-2018 advanced inverters become readily available in the market.
Small Generator Facility Interconnection - PC44 Interconnection Workgroup Phase III Final Report
Component
Institutional
Author
Maryland Public Service Commission Interconnection Working Group
Stakeholder
Maryland Public Service Commission
Recommendations on adopting Minimum Statewide Default Standards (MSDS) for smart inverters or distribution utility-specific inverter settings. IEEE 1547-2018 smart inverter functions of importance and associated policies and defaults proposed by the working group for statewide standards.