January 19, 2001
Report

Comparison Of Intake Gate Closure Methods At Lower Granite, Little Goose, Lower Monumental, And Mcnary Dams Using Risk-Based Analysis

Abstract

The objective of this report is to compare the benefits and costs of modifications proposed for intake gate closure systems at four hydroelectric stations on the Lower Snake and Upper Columbia Rivers in the Walla Walla District that are unable to meet the COE 10-minute closure rule due to the installation of fish screens. The primary benefit of the proposed modifications is to reduce the risk of damage to the station and environs when emergency intake gate closure is required. Consequently, this report presents the results and methodology of an extensive risk analysis performed to assess the reliability of powerhouse systems and the costs and timing of potential damages resulting from events requiring emergency intake gate closure. As part of this analysis, the level of protection provided by the nitrogen emergency closure system was also evaluated. The nitrogen system was the basis for the original recommendation to partially disable the intake gate systems. The risk analysis quantifies this protection level.

Revised: September 30, 2009 | Published: January 19, 2001

Citation

Gore B.F., T.R. Blackburn, P.G. Heasler, N.L. Mara, H.K. Phan, D.M. Bardy, and R.E. Hollenbeck. 2001. Comparison Of Intake Gate Closure Methods At Lower Granite, Little Goose, Lower Monumental, And Mcnary Dams Using Risk-Based Analysis Richland, WA: Pacific Northwest National Laboratory.